Case Example 1.
Steel Plant
– System flow 650 m3/h
– Demo / side stream installation, flow 500 – 1000 l/h
– Presented a summary of 3-week trial results
– Low metal content (mg/l) and high system flow
Case Example 2.
From pickling industry
– High level of soluble metals
– Results with continuous treatment
Case Example 3.
From Welding Industry
– Reduction 99,77 %